Jump to content

Featured Replies

Posted

We have been waiting 7 1/2 years and still don't have an install date for the install of the windmills in MA:

http://www.capewind.org/

It looks like Maine is on the way to install 132 megawatts of wind power:

http://nrcm.typepad.com/nrcminsider/2009/0...ross-maine.html

As part of the permitting process moving installing the generating capacity in Maine instead of the cape was looked it and it seems that the power lines are not capable of bringing the power down to Mass:

http://www.nae.usace.army.mil/projects/ma/ccwf/app3d.pdf

The full Cape Wind Energy Project Draft Environmental Impact Statement can be found at:

http://www.nae.usace.army.mil/projects/ma/ccwf/deis.htm

-Jason

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...